
One contract from the first cut to commissioning.
Earthwork, underground utilities, HVAC and plumbing, the hardest trades to coordinate, carried by one licensed partner for residential, multifamily and commercial projects across California.
Built to last.
Delivered beyond what’s expected.
We know where projects lose time and money: handoffs between trades, gray areas between mechanical, electrical and plumbing, and work nobody checks before it’s covered. PCG was built to close those gaps, and to stay reachable long after the job is done.
Straight talk, early
Tough questions raised early, options laid out openly, a path that protects the schedule.
Care for what nobody sees
Most of what we build gets covered up. We verify and photograph it first.
No budget surprises
Cost tracked by phase, so variances surface early, not at closeout.
Own it through resolution
Issues raised the moment we see them and owned through turnover and after.
Multiple trades. One mobilization. One party accountable.
Most projects split earthwork, utilities, HVAC and plumbing between separate subcontractors, weeks apart. The gaps between them are where schedules slip and change orders start. We carry them under one subcontract, so the work moves from one trade to the next without a handoff.
| What your project gets | Basic bid | The PCG advantage |
|---|---|---|
| Time saved for the GC | Separate trades to schedule and chase | One mobilization, one look-ahead, fewer coordination meetings |
| Lower cost for the owner | Rework and change orders from trade gaps | Fewer mobilizations, less rework, fewer change orders |
| Smoother trade handoffs | Trades bid and scheduled separately | Earthwork, HVAC, plumbing and MEP coordination planned together |
| MEP gray areas | Left between scopes | Interfaces between M, E and P assigned before rough‑in |
| In-house design‑build | Fit-up solved in the field | We design the HVAC we install, alongside your engineer of record |
| Site conditions addressed early | Found during excavation | Soil checks and inspections coordinated up front |
| Work behind the walls | Covered as installed | Verified and photographed before cover |
| A smoother owner handover | Install and leave | Startup, controls guidance and turnover |
| Service beyond warranty | Warranty period only | Ongoing maintenance and service after the warranty ends |
From the first cut to commissioning.
- 00PreconstructionConsultation on plans, scope and sequencing before the bid.
- 01EarthworkDemolition, excavation, shoring, trenching and utilities.
- 02StructureFoundations, sequenced with the earthwork.
- 03MEP rough‑inHVAC and plumbing roughed in together, coordinated with electrical.
- 04Close‑inConcealed work verified and photographed before cover.
- 05Startup & handoverCommissioning, controls guidance and turnover.
Bid one trade, or the whole package.
Design-build HVAC, with the trenching under the same contract.
Underground through trim, with the trenching under the same contract.
Mechanical, electrical and plumbing on one subcontract, with one point of contact.
Excavation, trenching and grading, sequenced for what follows.
Grading and underground utilities under a Class A license.
Multi-trade packages under one subcontract.
Where the trades meet.

- One trench plan for utilities, plumbing and HVAC lines
- Equipment pads and the grading around them, set once
- Backfill timed to line-set and duct inspections
- One look-ahead across earthwork, rough‑in and MEP coordination
Who we build for.
- Quantities you can trust. Take-off verified from the drawings, cut-and-fill balance stated before the bid.
- Constructability and sequencing. Equipment, duct routes, haul routes and grades checked against the schedule.
- Options, not surprises. Tough questions raised early, with priced alternatives.
- Code checked at design. Up to date with Title 24 and A2L refrigerant rules, before they become change orders.
- 01Plan reviewDrawings, specs and site conditions checked.
- 02Take-offQuantities verified, cut and fill balanced.
- 03SequencingEquipment, routes and grades set against the schedule.
- 04Priced bidClear scope, with options and alternatives.
Leave the hard work to PCG.
Confirmed the same business day. Send plans, specs or a bid-board invite.
